Parallaxe · Accounting & closing
Taking back your accounting in a new ERP: the mistake that is discovered six months later
Opening balance, open items, reconciliation, big bang or parallel run. What you have to decide, in which order, and the six checks that prevent 90% of unpleasant surprises — a data migration error surfaces six months later, once the project team has been disbanded.
Reading: 13 min
Key takeaways
Migration errors make no noise: they wait for the VAT return, the dunning run or the year-end close.
Two days of checks are enough to eliminate almost all of them.
Safety does not come from how many systems run in parallel, but from how many times you rehearsed.
Most requests for historical data are analysis needs: they are better served in a BI tool than in a general ledger.
01 · The problem
An error with no symptoms
In an ERP project, most defects announce themselves quickly: a screen blocks, an invoice is wrong, a user complains. Accounting migration does not work that way. Its detection delay follows the accounting cycle — VAT return, dunning campaign, depreciation charge, year-end close. Invoices go out, payments come in, everything works: the project is declared a success. The question lands six months later: "can you substantiate this balance?"
| Error | Surfaces | Signal |
|---|---|---|
| Trial balance out of balance | D+0 | Green — visible at import time |
| VAT migrated incorrectly | D+30 to D+90 | Amber — revealed by the VAT return or dunning |
| Wrong reconciliation | D+45 to D+120 | Amber — revealed by the VAT return or dunning |
| Missing due dates | D+60 | Amber — revealed by the VAT return or dunning |
| Wrong depreciation schedule | D+180 to D+365 | Red — no symptom before the close: nobody ever complains about them |
| Non-reconcilable accounts | D+365 | Red — no symptom before the close: nobody ever complains about them |
- In plain terms
Migrating means copying into the new system what the company owns, what it owes and what is owed to it. If the copy is wrong, nothing crashes: the figures are simply wrong, and they stay wrong until a control looks at them. Hence the rule: a migration is a signed accounting deliverable, not an import task.
02 · Scope
Six objects to decide on, one by one
"Are we migrating the accounting?" is the wrong question. It covers several objects, each with its own volume, risk and trade-off. Each one needs a written decision signed off by the CFO — a line with no decision is a decision taken by default by whoever writes the import script.
| N° | Object | Decision | What it is | Pitfall |
|---|---|---|---|---|
| 01 | Opening balance | Always migrated | A snapshot of every account balance at the cut-off date, with debits equal to credits. It is the foundation everything else hangs from. | confusing balance-sheet accounts (carried forward year to year) with P&L accounts (cleared at each close). A mid-year switchover forces a decision on the year-to-date income and expenses. |
| 02 | Open items | Always, at invoice level | Customer invoices not yet collected and vendor bills not yet paid. They are what funds the company, and what substantiates the receivable and payable balances. | the net balance per partner. It loses the due date (so the aged balance), the invoice reference (so payment matching) and the ability to issue a compliant credit note. |
| 03 | History | Usually archived, not migrated | The general ledger of prior years. It is the only object where dropping it outright is a legitimate option — and often the best one. | accepting the request without breaking it down. Year-on-year comparison, finding an old invoice, answering a tax audit: each of those is served for next to nothing, outside the ledger. |
| 04 | Fixed assets | Gross value + accumulated | Three different things: balance-sheet amounts (gross value and accumulated depreciation), the asset record itself, and the schedule of future charges. | migrating only the balances, assuming the schedule will be recalculated. It will — from scratch, over the full useful life — and the charge will be overstated until the close. |
| 05 | Inventory | Quantities + value | Where two worlds collide: logistics counts units, accounting counts money. The migration must produce both and keep them consistent. | double counting — the opening balance carries the inventory accounts, and the initial stock count feeds them a second time. The fix: manual valuation throughout the migration. |
| 06 | Cash | Balances + items in transit | Migrating a bank balance is trivial. Migrating items in transit — cheques issued but not cleared, deposits not yet credited, transfers in flight — is not. | migrating them as a lump sum. The first bank reconciliation becomes unmanageable, someone posts a plug entry, and an unexplained balance survives for three years. |
03 · Granularity
Open items: invoice-level detail, never a net balance
Open items are the customer invoices not yet collected and the vendor bills not yet paid at the cut-off date. The question is not whether to migrate them — always — but at what level of detail.
| Level | What is migrated | What you get | Verdict |
|---|---|---|---|
| A · Net balance per partner | DUPONT — €12,450.00 | No due date, no reference: no aged balance, no payment matching, no dunning. | Not enough |
| B · Invoice-level detail | F-2026-0412 · 30 Sep · €10,000.00 | Correct aged balance from day one, reconciliation and collection operational, credit notes referenceable. | The standard |
| C · Full document | Invoice + lines + taxes + PDF | Only worth it when a customer portal or a re-issue process requires it. Expensive: never for history. | Only if a use case demands it |
- E-invoicing
Since 1 September 2026, receiving electronic invoices has been mandatory for all VAT-registered companies in France (issuing: large companies and mid-caps first, then SMEs and micro-businesses on 1 September 2027). A credit note issued after go-live against a migrated invoice must reference the original invoice: with a net balance and no reference, it becomes impossible to produce cleanly. That is the shortest argument for level B.
04 · Timing
Go live at the start of a fiscal year whenever you can
The cut-off date is the date of the snapshot: before it, the legacy system; after it, the new one. It determines the company's ability to produce its annual reporting.
- First day of the fiscal year · recommended
P&L accounts start at zero and the statutory accounts are produced entirely by the new system. One constraint: the final closing balance only lands two to four months later, so you will need a top-up migration entry (year-end adjustments and the accountant's corrections) dated the first day of the year — then check that the opening balance equals the approved closing balance to the cent, and lock the period.
- Mid-year, balances only
No constraint on the project calendar, but the P&L is split in two: no detail for the first period, statutory accounts to be rebuilt by aggregation, and two ledger extracts to produce for a single audited year.
- Mid-year, replaying the detail
The whole year in detail, no analytical gap — but the underlying documents have to be replayed too, and the cost is usually three to five times higher.
05 · Strategy
Big bang or parallel run? The real question is elsewhere
| N° | Strategy | In short | Choose it when | The real risk |
|---|---|---|---|---|
| 01 | Big bang | The legacy system stops, the new one starts. No coexistence: a freeze window, a timed cutover plan, a written rollback procedure and a full rehearsal. | SMEs and mid-caps able to freeze operations for 48 to 72 hours. It is the default choice — and, counter-intuitively, the least risky. | Any anomaly found after the point of no return has to be fixed in production. Hence the mandatory rehearsal. |
| 02 | Parallel run | Transactions are entered in both systems and the outputs compared. Data-entry workload doubles for the whole period. | Heavily regulated environments, or an accounting process nobody documented. Otherwise, prefer replaying one closed month in a test database. | It defers the truth: while the legacy system remains the system of record, nobody treats the new one as real. |
| 03 | Phased | The scope is split and switched over in waves — ideally by legal entity, with a pilot subsidiary. | Groups with more than five entities, heterogeneous processes, comfortable budget. | Splitting by function: moving sales while keeping accounting behind forces you to build temporary interfaces, thrown away three months later. |
The only rule that matters
The most dangerous strategy is neither big bang nor parallel run. It is the migration executed for the first time on go-live day.
- 01T-3 months · dry run
On a real data extract, to surface the awkward cases. The result will be poor: that is the point.
- 02T-1 month · full rehearsal
Complete real data, timed end to end, control file signed off by the CFO.
- 03Go-live · final migration
An identical replay. Nothing new should happen here.
If the rehearsal does not produce an approved control file, go-live is postponed. Write it into the project plan at kick-off — and never schedule the switchover on a filing deadline or a busy month-end.
06 · The hard part
Reconciliation, the topic everyone underestimates
Reconciling means stating: "this invoice is paid by that payment". It appears in no financial statement — the trial balance is identical with or without it — and yet it is what makes a customer account usable. Above all, it is not data but a relationship: you do not import it, you rebuild it. Hence the rule: you can only reconcile what has been migrated on both sides.
| Entry | Label | Amount | After reconciliation |
|---|---|---|---|
| F-2026-0412 | Invoice · due 30 Sep 2026 | €10,000.00 Dr | partial A2 · residual €7,000.00 |
| ACP-0088 | Down payment received 12 Sep 2026 | €3,000.00 Cr | reconciled A2 |
| F-2026-0455 | Invoice · due 15 Oct 2026 | €4,800.00 Dr | reconciled A1 |
| VIR-2210 | Transfer received 14 Oct 2026 | €4,800.00 Cr | reconciled A1 |
| Account balance | €7,000.00 | unchanged |
Reconciliation moves not a single euro: a migration can be "balanced" and still be unusable.
What collections sees
Four open lines for a €7,000.00 balance. Collections knows neither what is due nor when.
- 01Invoice F-2026-0455 with transfer VIR-2210
Full reconciliation A1: €4,800.00 matched. The lines leave the aged balance, and the account balance has not moved by a cent.
- 02Then invoice F-2026-0412 with the down payment
Partial reconciliation A2: €3,000.00 matched. The invoice stays open for its residual amount — and it is that residual, not the original amount, that collections will see.
- 03F-2026-0412 · €7,000.00
1 open line — this is what the aged balance and dunning will show.
- The recommended trade-off
For most SMEs and mid-caps: do not migrate history, therefore do not migrate reconciliation, and stick to open items. Two measures make that decision comfortable: read-only access to the legacy system for the statutory retention period, and history loaded into a BI tool for year-on-year analysis. Because the need behind a request for history is almost always an analysis need — and analysis is better served in a BI tool than in a general ledger.
07 · The key control
One technical account, which must end at zero
A migration is loaded in batches: general accounts, customers, vendors, fixed assets, inventory. Each batch on its own is unbalanced. A single suspense account absorbs those imbalances — and must show a nil balance at the end.
If it is not at zero, the migration is wrong. No nuance, no interpretation. Three simple companions: a dedicated migration journal, the same accounting date on every entry (but original due dates preserved), and a suspense account that is non-reconcilable and out of users' reach.
| N° | Batch | Effect | Suspense account |
|---|---|---|---|
| 01 | General ledger balances | + 1,661,245.42 | 1,661,245.42 |
| 02 | Customer open items | − 1,248,337.42 | 412,908.00 |
| 03 | Vendor open items | + 402,118.00 | 815,026.00 |
| 04 | Fixed assets | − 327,555.58 | 487,470.42 |
| 05 | Inventory | − 412,908.00 | 74,562.42 |
| 06 | Cash in transit | − 74,562.42 | 0.00 |
Batches 01 to 05: imbalance while batches load — expected. Batch 06: migration balanced · control cleared.
08 · The errors
Six errors, six checks of a few minutes each
The costliest migration errors can all be caught by a short check — provided you know which one. Put end to end, these checks amount to roughly two person-days — and they are the first thing sacrificed when the schedule slips.
| N° | Error | What happens | The check that prevents it | Time to check |
|---|---|---|---|---|
| 01 | Due dates lost | Every migrated receivable falls into the same aged-balance bucket. DSO is wrong, and so is any ageing-based provision. Spotted in a management meeting, when customer overdues drop 60% in the month of go-live. | Compare the source and target aged balance, bucket by bucket. | 5 min |
| 02 | Depreciation restarted from zero | Asset records are created without the amount already depreciated: the year's charge is overstated, sometimes threefold. Found at the annual close. | Check that the sum of accumulated depreciation on the asset records equals the accumulated depreciation balance in the trial balance. | 10 min |
| 03 | Inventory counted twice | The opening balance carries the inventory accounts and the initial count feeds them again. If the offset is an inventory-variance account, it is profit that is wrong — visible only in margin analysis. | Check that the valuation reported by the logistics module equals the inventory account balances. | 15 min |
| 04 | Non-reconcilable accounts | A suspense or intercompany account is migrated without being flagged as reconcilable. It then accumulates lines that cannot be cleared, and its balance becomes impossible to justify. | List at kick-off every account that must be reconcilable — well beyond partner accounts — and verify the setup before migrating. | 30 min |
| 05 | VAT migrated without tax codes | The first return omits the migrated transactions, or the VAT balances sit frozen on the balance sheet and never clear. Detected between D+30 and D+90 — sometimes only at the annual reconciliation. | Review the first return in detail, line by line, before filing. | 2 h |
| 06 | Bad reconciliation, revealed by dunning | A customer receives a reminder for an invoice paid four months ago. They call. Trust takes the hit. | Review the first dunning run manually and in full, whatever the volume. It is free, and it is the best test available. | 4 h |
09 · Odoo
Three Odoo specifics to know before you estimate
- An invoice is a journal entry
There is no accounting module separate from invoicing, so there is no "post to accounting" step to trigger: creating a posted invoice creates the entry.
- Reconciliation is executed, not imported
There is no "matching code" to load: reconciliation is an operation run on a group of lines. This is the number-one cause of underestimated effort for teams coming from a classic accounting package.
- VAT is reported from the lines, not from balances
The return is built from the taxes carried by each line. An entry migrated without tax will never appear in a return; an entry migrated with a standard tax will appear a second time. Hence two distinct treatments: plain balances for VAT already declared, neutral technical taxes for migrated documents.
- Two practical consequences.
First, load migration entries as drafts, run every check, then post in bulk once the control file is signed off: once posted, a French entry is hash-chained and can no longer be amended.
Second, plan for stable external identifiers on every imported line: that is what makes the migration replayable — three identical runs, exactly the same result.
Conclusion
A migration is a deliverable, not a task
Three decisions secure the essentials: migrate open items at invoice level, go live at the start of a fiscal year, and rehearse until two runs produce the same result. The rest — history, legacy reconciliation, analytic accounting — is open for discussion: these are options, not obligations.
A successful migration goes unnoticed. It is measured by the absence of events.
No customer chased in error, no amended return, no absurd depreciation charge, no orphan suspense balance. It is a deliverable whose quality shows up as silence — which is exactly why it is so often under-invested.